Welfare facilities will be developed in the larger structure of 6500 m2, and storage halls will be established in the smaller part of 3,600 m2 of the building. A great help in assembling the elements of the hall is a huge crawler crane with a lifting capacity of 100 tons, which with its mobility contributes to the faster movement of the reinforced concrete elements.