The foundation stone of the new operation hall was laid on March 22in the county town of the Bakony region. The new building of approx. 5,500 sq.m. will be twice as large as the existing facility of the Hungarian Post operated beside the Veszprém railway station and will be surrounded by 15,000 sq.m. paved surfaces. In line with the current sophisticated parcel-handling requirements, the hall shall comprise seven docking stations, six level-adjusted industrial doors and two extra gates needed to handle the traffic of the delivery vehicles and transport trucks. The new depot to be completed by Grabarics Ltd. shall meet the service requirements experienced by approx. 305,000 customers living in 209 municipalities in the vicinity of Veszprém and shall create more than 160 jobs. Grabarics Ltd. shall meet the tasks of comprehensive designing and turn-key implementation. The completely prefabricated reinforced concrete frame structure of the new hall shall be designed, manufactured transported to and installed at the site by Grabarics Vasbeton.